Ideal for all off road applications and remote access conditions
Capabilities
200m Hq
Ideal for all off road applications and remote access conditions
200m Hq
Ideal to maneuver for inner city operations and can easily craned into difficult positions
150m Hq
Designed as a light weight and compact unit yet comprising all required features for performing high quality and reliable CPTU’s and SCPTU’s
20 tonne push
DCN Drilling completed stage one geotechnical investigation with ground monitoring installations, resolving the challenges of very difficult access.
Difficult access.
Successfully completed.
240million dollar pipeline, 30km long from Manukau to Auckland city – DCN Drilling completed two-thirds of the contract.
Traffic management and buried services.
Successfully completed.
DCN drilling completed all four seasons of investigation, core sampling and seismic installation between Ohinewai and Gordonton.
Difficult access and avoiding stock.
Successfully completed.
Site investigation by measuring the soil strength with appropriate equipment and tools
Water well of all sizes and complexility levels aimed at achieving good drinking water.
Drilling geothermal monitoring wells to analyse the sustainability of a power generation system.
0800 326 375
dcndrillingltd@xtra.co.nz
Error: Contact form not found.